Interactive Electrical Systems

Projects

Explore a range of completed electrical projects and client success stories.

InterActive Electrical Systems Expertise

Midland Junction Project

Electrical rejuvenation for Midland Junction heritage buildings.

The Midland Junction project involved revitalising the electrical systems of several heritage buildings. These buildings presented unique challenges due to existing intricate underground cabling routes that required careful navigation to avoid disruption. Additionally, maintaining the buildings' historical aesthetics meant ensuring no new cabling would be visible on the exterior.

InterActive Electrical Systems, offered a comprehensive solution that addressed the project's technical and aesthetic aspects.

Our services included:

  1. Expert Planning and Collaboration: We meticulously planned the underground cable routes, utilising hand-digging and surveying techniques to minimise damage to existing infrastructure.
  2. Community Engagement: A dedicated community engagement team facilitated smooth communication between the builder, client, and Western Power, ensuring everyone was informed and involved throughout the project.
  3. 24/7 Availability: Our team was available around the clock to address any unexpected issues or emergencies that might arise during the project.

Services Included:

  1. Electrical system upgrades for heritage buildings.
  2. Planning and execution of complex underground cable runs.
  3. 24/7 emergency response throughout the project.

Contact us

We have Certified Electrical Systems to Optimise, Maintain, and Ensure Safety.

Whim Creek Mine Project

Ensuring compliance at the Whim Creek mine site

The Whim Creek mine site encountered an urgent electrical compliance issue. Strict regulations demanded immediate rectification to avoid operational downtime, and the tight time frame presented a significant challenge in resolving the non-compliant electrical works.

Our proposed solution was to respond to the critical situation and demonstrate a commitment to prompt action and compliance expertise. 

Our solution included:

  1. Rapid mobilisation: Our team was on-site within 48 hours of the initial call, prioritising a swift response to minimise disruption to the mine site’s operations.
  2. Efficient compliance rectification: Through a highly focused effort, our qualified electricians rectified all non-compliant electrical works within five days. This fast turnaround ensured that the mine site could resume operations with minimal downtime.
  3. Streamlined logistics: Understanding the situation’s urgency, we prioritised overnight freight of all necessary materials. This proactive approach eliminated delays and expedited the rectification process.

Services Included:

  1. On-site electrical compliance inspection.
  2. Rectification of all non-compliant electrical works.
  3. Overnight material procurement and logistics.

InterActive Electrical Systems’ swift response and expertise in electrical compliance ensured that the Whim Creek mine site regained compliance within a concise timeframe.  Our commitment to minimising downtime allowed the mine site to resume operations quickly.

Request A Quote

Scroll to Top